RBLX displays Actual Risk (the calculated numerical value for each item under assessment). It is presented for the time of RBI analysis date and future evaluation date, before and after inspection. Also, a residual risk after application of an approved inspection strategy is presented. Our risk matrix is the same as the standard 5 x 5 matrix in API 581. RBLX can display overall Facility Risk by Asset Hierarchy.